Mining Industry
Shwager Energy Antofagasta Minerals
- Project description: AMSA Optimization CUPROCHLOR Secondary Sulfides.
- Construction of 3 Electrical Rooms.
- Construction of platforms, railings and others.
- Duration: 07/2020 – 01/2021
- Effort (Man-Days) 1400 MD
Schwager/SACYR/Mainstream
- Project description: Electrical Substations Tchamma and Alena Projects
- Electrical Room Construction.
- Construction of platforms, railings and others.
- Duration: 03/2020 – 11/2020
- Effort (Man-Days) 1320 MD
Schwager Energy/Angloamerican
- Project description:35 ton container type electrical room.
- Electrical Room Construction.
- Construction of platforms, railings, among others.
- Duration: 05/2019 – 09/2019
- Effort (Man-Days) 510 MD
Schwager Energy/Codelco División Gabriela Mistral
- Project description: Control Cabin Construction.
- Duration: 04/2019 – 07/2019
- Effort (Man-Days) 412 MD
Schwager Energy/Soquimich
- Project description:Container-type electrical rooms 65 tons.
- Electrical Room Construction.
- Construction of Control Rooms.
- Construction of the Operating Room.
- Construction of platforms, railings, among others.
- Duration: 01/2019 – 03/2019
- Effort (Man-Days) 400 MD
Schwager/Codelco División Chuquicamata
- Project description:Improvement of the smelting furnace powered by Codelco Chile Chuquicamata.
- Division.Electrical Room Construction.
- Construction of Operation Cabin.
- Construction of platforms, railings, among others.
- Duration: 12/2017 – 04/2018
- Effort (Man-Days) 732 MD
Mas Errázuriz/Codelco
- Project description: Supply, installation and commissioning of voice and data network for agency of Schwager Service at Calama
- Duration: 09/2014 – 11/2014
- Effort (Man-Days): 120 MD
Finning Chile S.A/ Codelco
- Project description: Supply Installation, assembly and start-up of networks and sensors for remote and autonomous operation of LHD equipment inside the emerald mine, Codelco El Teniente Division. Pioneering project for remote operation from cities, without transferring operators to mountain industrial areas
- Duration: 08/2016 – 04/2017
- Effort (Man-Days) 2800 MD
Codelco, División El Teniente
- Project description: Power supply service for a modular system including certification of pre-assembled cable, Codelco, División El Teniente, Caletones
- Duration: 07/2015- 08/2015
- Effort (Man-Days): 100 MD
Codelco, División El Teniente
- Project description: Structured cabling and laying of fiber optics including certification to extend the voice and data network in different properties of Codelco, División El Teniente, Coya
- Duration: 12/2014 – 03/2015
- Effort (Man-Days): 240 MD
Codelco, División Ministro Hales
- Project description: Rent of machinery and equipment to División Ministro Hales
- Duration: 2015
Minera Valle Central
- Project description: Supply and installation of 6.5 kms fiber optics for communication and process control regarding the extraction system at Cauquenes (Requínoa)
- Duration: 09/2015 – 11/2015
- Effort (Man-Days): 720 MD
Codelco
- Project description: Supply, installation and commissioning of voice and data network regarding roasting plant operations at Codelco, División Ministro Hales
- Duration: 10/2014 – 12/2014
- Effort (Man-Days): 180 MD
Schwager Service
- Project description: Supply of electronic LED lighting products for all Codelco divisions by frame contract of ilumination
- Duration: 01/2012 – 12/2014
- Effort (Man-Days): 720 MD
Schwager Serrvice/Codelco División Chuquicamata
- Project description: Supply, installation and commissioning of voice and data network for concentrator plant operations at Codelco, División Chuquicamata
- Duration: 08/2013 – 10/2013
- Effort (Man-Days): 120 MD
Schwager Energy/Collahuasi SCM
- Project description: Supply, installation and assembly of solar poles and their respective control systems at Rosario and Puerto Patache
- Duration: 04/2012 – 01/2013
- Effort (Man-Days): 600 MD